Thursday, September 8, 2011
Tile and Grout and Paint! Oh My!
Monday, March 7, 2011
Bathroom Happenings
Thursday, February 3, 2011
Insulation
The next thing to do was insulation. I know what you are going to say...Why insulate such a small space when the rest of the basement doesn't even have insulation? Well, here is my thinking on the matter. It's not often that you have a room torn down to the studs so you may as well go the extra mile when you do. And, this new bathroom is right off the family room so a little bit of sound deadening will be well worth it. I am already loving the insulation. When the toilets are flushed upstairs, you would never know it if you are sitting downstairs. Also, the furnace room (right next door) has been silenced. Such a wonderful noise.
Tuesday, January 26, 2010
I'm excited about sheet-rock!
Guy also decided to post a classified ad to sell the old vanity, sink and medicine cabinet. I was not optimistic that we would get any bites on it but I was wrong. The ad was up for less than an hour and we got two calls on it and everything was out of the house an hour after that. Amazing! I love on-line classifieds!
Wednesday, August 12, 2009
Electrical
Monday, August 10, 2009
Bathroom progress?

A while back, Guy's friend Courtney came over and helped him pour concrete to fill the holes where we put in new plumbing. We also bought a toilet, vanity, counter top, sink and mirror that are ready to be installed. The original deadline for this project was when Elliot was born. Then I moved it to June 1 and I told Guy that I would be hiring a contractor. Obviously, I haven't done that yet. We have a good friend that is willing to help Guy with the sheet rock when he is ready which should be soon. (We'll see about that.) After that, it should be easy to do some painting and tile work and a few finishing touches. Maybe it will be done by Christmas this year...when Elliot is a year old.

Thursday, August 28, 2008
New Plumbing...New Tub

Monday, August 18, 2008
Last day of nothingness

Saturday, May 10, 2008
Breaking Concrete
I could have titled this post "My Wonderful Husband" because that really says it all. Right after work yesterday, Guy rented a jack hammer to start some major concrete breaking for our relocated bathroom. He worked on it until about 9:30 last night and then took a break until 9:00 this morning. From 9:00 until noon, he worked on finishing the holes in the basement which now include one for the new tub, one for the new toilet, one to cap off the old toilet, and one to cap off the drain for the old shower. What a job and what a ton of concrete!
Sunday, May 4, 2008
Progress on the Bathroom
First for the bathroom. Guy has been trying a few different tricks to break through the concrete (most involving a sledge hammer) but nothing has worked too well. So, we are planning on renting a jack hammer to do the tough work but Guy wanted to get some dirty work done by cutting the concrete with a diamond blade to outline where the jack hammer would be doing its work. Another thing that needed to be done to make jack hammering easier was to do more demo on the old bathroom. We got the toilet out of there and took the shower door off the shower but then Guy discovered that the shower insert wouldn't fit through the door to get it out of there. So, he put his handy Saws-All to work and cut the shower into 5 pieces. I think that was about his favorite part of the day. He also tore off some sheet rock and some of the old linoleum.

The beginnings of a hole in the concrete.
Guy with premature grey (or maybe just a lot of concrete dust).
I spent a couple of hours out in the dirt to try and prepare my flower bed for flowers. Before we moved in, the previous owners did a quick fix in the flower bed and just covered it with black plastic and then 1"-5" of dirt. The biggest problem though is that there is a giant morning glory infestation under the plastic that is constantly breaking through. There were also some tulip bulbs under the plastic that have been able to find their way up. I figured that I would never be able to get a handle on the morning glory until the plastic was gone. Now I'm a third of the way done and I'm hoping for good weather so that I can finish this week and then get some flowers planted.
Friday, January 11, 2008
Let the demolition begin!

For a while, we thought about all the ways that we could make that bathroom work. But in the end, we realized that if we wanted a bathroom that was big enough to turn around in, we would have to relocate the bathroom. Luckily, our family room is very large and so we are just going to take a chunk out of it for our new bathroom. For the most part, we are just fliping everything around 180 degrees. In the process, we have gotten three different bids. The first was from a general non-licensed handy man who could do everything for about $3000. The next was from a general contractor who would do all the work for $8000. Finally, I discovered that we have a licensed plumber in our ward that can do all the plumbing work, including a new tub and toilet, for around $1000. We will be doing a lot of labor ourselves but it will save us a lot of money in the long run. I am really excited to be on the road to getting a working, functional bathroom in our basement. Last night, Guy started punching out the sheet rock to prepare the space. The carpet was torn up before we moved in so that is one less thing that we have to do. Next, Guy will be cutting holes in the concrete so that the plumber can come back and make new drains for everything and run all the new water lines.






