I got the bathroom painted a while back, sometime around late March or early April. I really don't remember exactly when. Then we were ready to pick out tile and get going with that step. I went to Home Depot and took their little tile class and convinced myself that I could do it. First step was prep. We cleaned up the floor and tried to level it. We failed miserably, but called it good enough and moved on.

While avoiding the tile job, I painted the wall on the other side of the bathroom. Guy had taken a paint chip to Home Depot to match the color. That is something that I will never do again. After the paint dried, it was clear that the paint didn't match and the other two walls would need to be painted too. Luckily, I liked the new color or else I would have picked out a whole new color and started over.

See the difference? Awful, huh?

This room doubled as our work space during the project.

On August 27th, we finally laid the tile. Courtney was nice enough to come over and help since Guy and I were both afraid that we would somehow mess it up. Guy and I had previously cut all the tiles and labeled all of them so we knew exactly where everything would go. This really helped things go quickly. Then, on Tuesday night, Guy and I did the grout. We watched a few YouTube videos and then dove right in. It was very tedious work, and we finally finished up just before midnight. I love how it turned out. I still need to do the baseboard tiles, but I want to get the vanity in first. And that should happen after I seal the grout.

Guy also started installing the lighting this past weekend. It sure does make the bathroom bright. I told him that the girls will really appreciate it when they are teenagers and spend the majority of their morning in front of the mirror getting ready for their day.
Slowly, but surely, the bathroom is coming along. If we can just keep up the momentum, it might just be done by Christmas. That would be the best present ever!